Photo - Startup 64722
64722

CIM Build

Australia
Market: Building
Project stage: Operating business
 
Also this project:
- Participate in the Unicorn Battle

Idea or High Level Concept

Building the AI memory layer for construction

Traction and Current Status

US$561K annualized run rate in 4 months with a team of 4 and no sales team.

15 general contractors in Australia have signed, including groups turning over US$2B+ a year. 11 are on annual or per-project contracts and 4 are in pilots.

Deals close fast. One contractor signed an annual contract 2 days after the first demo, and about 1 in 6 first meetings signs. Usage is 3.3x June, and 11 of the 15 contractors have run more than one project through CIM.

Problem or Opportunity

On the CIM Build platform, a construction project sees on average 180 drawing changes in its busiest week. Every one has to be checked by hand against the specs, the contract and every other drawing.

The general contractor wears whatever gets missed. A contract hands them every design mistake the day they sign, and they run on 3% margins, so the change nobody catches comes straight out of profit. It usually turns up on site, where it’s most expensive to fix. One word changed at contract cost my co-founder Kevin’s team $300K.

Solution

CIM reads every drawing, spec and contract on a project and builds one connected model of the building, a construction ontology. Teams of AI agents check every change and against the contractor’s own standards. Other tools check the plans. CIM checks the building. The hard part is construction knowledge - how a building actually goes together. Kevin spent a decade as a builder to build this.

Business Model, Chanells, Metrics

Contractors buy per project or on an annual contract. Per project is priced on the project’s value and paid at bid stage, before they’ve won the job. The fee sits on that job’s budget, so it skips the six sign-offs a software subscription needs. Annual covers all their projects.

Most start with a paid pilot on a live bid, then move onto one of the two. Per project is more than 80% of our run rate, and because it tracks project value, revenue grows with the size of the job.
arrow_back
EN